Guides and articles on Lean Six Sigma, continuous improvement, and project management.

Featured

What Is SixGrid?

SixGrid is project management software built for continuous improvement work. Charters, phase-based milestones, and financial tracking are built in, so practitioners run DMAIC and Kaizen projects without rebuilding the structure in spreadsheets.

Continuous Improvement

Browse by topic

Latest articles

Why Your Six Sigma Project Tracker Spreadsheet Fails at Ten Projects

A spreadsheet tracks one Six Sigma project fine. It breaks in a predictable order as the program grows: status and results split into separate files, every belt tracks differently, leadership gets no roll-up, and nobody can say who changed a number. The break points, and what a tracker must show.

Continuous Improvement

The Six Sigma Final Report: What to Include and How to Close the Project

The four sections a Six Sigma final report needs, how to write a one-page executive summary a manager can read alone, what a useful lessons-learned entry looks like, and the three closure steps after sign-off.

DMAIC

How to Calculate COPQ for a Single Six Sigma Project

Size the opportunity for one project: which failure costs count, how long a sample period to use, how to annualize, and how to write the one-line basis a controller can reproduce. With a fully worked example.

Continuous Improvement

Writing a Six Sigma Problem Statement That Survives the Define Tollgate

Six weak-versus-strong problem statement pairs from manufacturing, healthcare, finance, logistics, IT, and contact centers, with the reason each weak one fails the Define tollgate and a drafting procedure that passes it.

DMAIC

How to Set a Defensible Baseline in the Measure Phase

A baseline is defensible when it survives four questions: which period, which source, can the gauge see the change, and when was it frozen. How to answer them in the charter before the sponsor and finance ask.

Continuous Improvement

Cost Avoidance vs Cost Savings in Six Sigma Projects

Why cost avoidance feels like savings to the practitioner and vanishes at the controller's desk, the three-condition test that makes it hard, how to document the would-have-been baseline, and why it needs its own benefit type.

Continuous Improvement

Primary Metric vs Secondary Metric: What to Fix and What Not to Break

One metric the project exists to move, two to four it must not break. Selection rules for primary and secondary metrics, worked pairings by industry, and why a program office needs every charter to define them the same way.

DMAIC

The DMAIC Tollgate Review Checklist, Gate by Gate

The questions the champion asks and the evidence the project leader brings at each of the five DMAIC tollgates, with the exit condition for each gate. A gate is a go, revise, or stop decision, not a status meeting.

DMAIC

How to Structure a CI Program: Groups, Roles, and Governance

The four structural decisions that outlive any single project: where visibility boundaries sit, how roles split authority, how tollgates govern the work, and how ideas enter the pipeline.

Continuous Improvement